Hi IBPers
I am populating the SAP5 Control Tower planning area and have a set of data ready to load. However checking the planning levels in SAP5 I see that the root attribute in the time dimension for all planning levels is set to PERIODID.
Does anyone know if this is intentional? I am more used to seeing either Months or weeks selected as for SAP2 or SAP3. Or are we supposed to select the time granularity for each planning level according to the business requirements? If it is left as is do any kf loads go into whichever daily period bucket the keyfigure date corresponds to. I assume that we have to be careful regarding attributes as kf and their from to periods?
Any advice appreciated.