Dear gurus
in the business scenario we consider planned delivery costs (freight and duties) relevant for material costing.
In PO freight and duties are managed as price condition for each item.
During LIV we can have some delta price because the costs planned in the PO are estimated and could be different from the invoice.
The problem is that we can have sevaral items (300 -500 items) in LIV and it's very hard to distribute correcty the total difference of the invoice on each item.
How can I solve the issue?
Thanks
M.