Hi,
I am trying to install ABAP application server with netweaver gateway trial version. While installing some jobs were failed.
java version "1.8.0_51"
Java(TM) SE Runtime Environment (build 1.8.0_51-b16)
Java HotSpot(TM) 64-Bit Server VM (build 25.51-b03, mixed mode)
Import Monitor jobs: running 1, waiting 5, completed 28, failed 0, total 34.
Import Monitor jobs: running 2, waiting 4, completed 28, failed 0, total 34.
Import Monitor jobs: running 3, waiting 3, completed 28, failed 0, total 34.
Loading of 'SAPSLOAD' import package: ERROR
Import Monitor jobs: running 2, waiting 3, completed 28, failed 1, total 34.
Loading of 'D010INC' import package: ERROR
Import Monitor jobs: running 1, waiting 3, completed 28, failed 2, total 34.
Loading of 'D010TAB' import package: ERROR
Import Monitor jobs: running 0, waiting 3, completed 28, failed 3, total 34.
Import Monitor jobs: running 1, waiting 2, completed 28, failed 3, total 34.
Import Monitor jobs: running 2, waiting 1, completed 28, failed 3, total 34.
Loading of 'SAPSLEXC' import package: ERROR
Import Monitor jobs: running 1, waiting 1, completed 28, failed 4, total 34.
Loading of 'WBCROSSGT' import package: ERROR
Import Monitor jobs: running 0, waiting 1, completed 28, failed 5, total 34.
How to resolve these failed jobs? I think because of these errors I am getting another error saying "Migration monitor exits error 103".
Could any body suggest me how to resolve those errors.
Thanks and Regards,
Teja.